DIN - German national standards

Page 6221

199758 products found
Sort by:
  • relevancy
    • relevancy
    • date (latest)
    • date (oldest)
E DIN 13231-2:1991-03 (1.3.1991)

E DIN 13231-2:1991-03 (01/03/1991) Withdrawn

Stretchers for use in aircrafts; with fixed poles; requirements, testing.
(Krankentrage zur Verwendung in Luftfahrzeugen mit starren Holmen; Anforderung, Prüfung.)

Available languages: German

Available design: Print design

from 53.60 EUR more info
DIN 13231-2:1992-11 (1.11.1992)

DIN 13231-2:1992-11 (01/11/1992) Withdrawn

Stretchers for use in aircrafts with fixed poles, non-folded; requirements, test.
(Krankentrage zur Verwendung in Luftfahrzeugen mit starren Holmen, nicht zusammenlegbar; Anforderungen, Prüfung.)

Available languages: German

Available design: PDF - Immediate download, Print design

from 41.80 EUR more info
E DIN EN 13231-2:2000-02 (1.2.2000)

E DIN EN 13231-2:2000-02 (01/02/2000) Withdrawn

Railway applications - Track; acceptance of works - Part 2: Work on switches and crossings.
(Bahnanwendungen - Oberbau; Abnahme von Arbeiten - Teil 2: Abnahme von Oberbauarbeiten an Weichen.)

Available languages: German

Available design: electronic design (pdf), Print design

from 69.90 EUR more info
E DIN EN 13231-2:2003-12 (1.12.2003)

E DIN EN 13231-2:2003-12 (01/12/2003) Withdrawn

Railway applications - Track; Acceptance of works - Part 2: Works on track; Switches and crossings.
(Bahnanwendungen - Oberbau; Abnahme von Arbeiten - Teil 2: Oberbauarbeiten an Weichen und Kreuzungen.)

Available languages: German

Available design: electronic design (pdf), Print design

from 69.90 EUR more info
DIN EN 13231-2:2006-08 (1.8.2006)

DIN EN 13231-2:2006-08 (01/08/2006) Withdrawn

Railway applications - Track - Acceptance of works - Part 2: Works on ballasted track - Switches and crossings.
(Bahnanwendungen - Oberbau - Abnahme von Arbeiten - Teil 2: Arbeiten im Schotteroberbau - Weichen und Kreuzungen.)

Available languages: English, German

Available design: PDF - Immediate download, Print design

from 77.20 EUR more info
E DIN EN 13231-2:2019-08 (1.8.2019)

E DIN EN 13231-2:2019-08 (01/08/2019) Withdrawn

Railway applications - Track - Acceptance of works - Part 2: Acceptance of reprofiling rails in plain line, switches, crossings and expansion devices.
(Bahnanwendungen - Oberbau - Abnahme von Arbeiten - Teil 2: Abnahme von reprofilierten Schienen im Gleis, Weichen, Kreuzungen und Schienenauszügen.)

Available languages: English and German

Available design: electronic design (pdf), Print design

from 150.70 EUR more info
E DIN EN 13231-3:2001-03 (1.3.2001)

E DIN EN 13231-3:2001-03 (01/03/2001) Withdrawn

Railway applications - Track; Acceptance of works - Part 3: Acceptance of Rail Grinding, Miling and Plaining Work in Track.
(Bahnanwendungen - Oberbau; Abnahme von Arbeiten - Teil 3: Abnahme von Schleif , Fräs- und Hobelarbeiten an Schienen im Gleis.)

Available languages: German

Available design: electronic design (pdf), Print design

from 116.60 EUR more info
E DIN EN 13231-3:2004-01 (1.1.2004)

E DIN EN 13231-3:2004-01 (01/01/2004) Withdrawn

Railway applications - Track - Acceptance of works - Part 3: Acceptance of Rail Grinding, Milling and Plaining Work in Track.
(Bahnanwendungen - Oberbau - Abnahme von Arbeiten - Teil 3: Abnahme von Schleif-, Fräs- und Hobelarbeiten an Schienen im Gleis.)

Available languages: German

Available design: electronic design (pdf), Print design

from 98.30 EUR more info
DIN EN 13231-3:2006-08 (1.8.2006)

DIN EN 13231-3:2006-08 (01/08/2006) Withdrawn

Railway applications - Track - Acceptance of works - Part 3: Acceptance of rail grinding, milling and planing work in track.
(Bahnanwendungen - Oberbau - Abnahme von Arbeiten - Teil 3: Abnahme von Schleif-, Fräs- und Hobelarbeiten an Schienen im Gleis.)

Available languages: English, German

Available design: PDF - Immediate download, Print design

from 105.40 EUR more info
E DIN EN 13231-3:2009-11 (1.11.2009)

E DIN EN 13231-3:2009-11 (01/11/2009) Withdrawn

Railway applications - Track - Acceptance of works - Part 3: Acceptance of reprofiling rails in track.
(Bahnanwendungen - Oberbau - Abnahme von Arbeiten - Teil 3: Abnahme von reprofilierten Schienen im Gleis.)

Available languages: German

Available design: electronic design (pdf), Print design

from 111.40 EUR more info
Loading
Cookies Cookies

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů.