ASTM C1010-83(1992)e1 img
Withdrawn | Published: 01/01/1992

ASTM C1010-83(1992)e1 Withdrawn

Standard Guide for Acceptance, Checkout, and Pre-Operational Testing of a Nuclear Fuels Reprocessing Facility (Withdrawn 2001) (Includes all amendments And changes 3/2/2021).

Available languages: English

Available design: Online Secure PDF, Print design

from 66.30 EUR show on eshop

Detail information

Designation: ASTM C1010-83(1992)e1

Publication date: 01/01/1992

Pages: 4

Note: Withdrawn

Country: American technical standard

Where to buy?

You can buy at www.mystandards.biz

Anotation

Keywords:
Nuclear facilities, Purex process, Reprocessing (nuclear) facilities, acceptance/checkout/pre-operational testing of a nuclear fuels, reprocessing facility, guide, ICS Number Code 27.120.30 (Fissile materials and nuclear fuel technology)
Loading
Cookies Cookies

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů.