ASTM C1320-05(2009)e1 img
Withdrawn | Published: 01/09/2009

ASTM C1320-05(2009)e1 Withdrawn

Standard Practice for Installation of Mineral Fiber Batt and Blanket Thermal Insulation for Light Frame Construction (Includes all amendments And changes 12/31/2010).

Available languages: English

Available design: Online Secure PDF, Print design

from 77.00 USD show on eshop

Detail information

Designation: ASTM C1320-05(2009)e1

Publication date: 01/09/2009

Pages: 4

Note: Withdrawn

Country: American technical standard

Where to buy?

You can buy at www.mystandards.biz

Anotation

Keywords:
batt and blanket, installation, light frame construction, mineral fiber, Batt thermal insulation, Attic insulation, Blanket thermal insulation, Ceilings, Flooring/floor covering systems, Installation--thermal insulating materials, Light frame construction, Mineral fiber insulation, Walls, ICS Number Code 91.100.60 (Thermal and sound insulating materials)
Loading
Cookies Cookies

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů.