IEC 62256-ed.2.0 img
Active standard | Published: 30/05/2017

IEC 62256-ed.2.0

Hydraulic turbines, storage pumps and pump-turbines - Rehabilitation and performance improvement
(Turbines hydrauliques, pompes d´accumulation et pompes-turbines - Rehabilitation et amelioration des performances)

Available languages: English, English and French

Available design: electronic design (pdf), Print design, CD-ROM

from 706.40 USD show on eshop

Detail information

Designation: IEC 62256-ed.2.0

Publication date: 30/05/2017

Pages: 158

Country: International technical standard

Where to buy?

You can buy at www.mystandards.biz

Anotation

IEC 62256:2017 covers turbines, storage pumps and pump-turbines of all sizes and of the following types: Francis; Kaplan; propeller; Pelton (turbines only) and bulb turbines. This document also identifies without detailed discussion, other powerhouse equipment that could affect or be affected by a turbine, storage pump, or pump-turbine rehabilitation. The object of this document is to assist in identifying, evaluating and executing rehabilitation and performance improvement projects for hydraulic turbines, storage pumps and pump-turbines. This document can be used by owners, consultants, and suppliers to define: needs and economics for rehabilitation and performance improvement; scope of work; specifications and evaluation of results. This document is intended to be: an aid in the decision process; an extensive source of information on rehabilitation; an identification of the key milestones in the rehabilitation process; and identification of the points to be addressed in the decision processes. This document is not intended to be a detailed engineering manual nor a maintenance document. This second edition cancels and replaces the first edition published in 2008. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: Tables 2 to 23 modified, completed and moved to Annex A; 7.3.2: subclauses moved with text changes; new subclauses on temperature, noise, galvanic corrosion, galling and replacement of components without assessment; 7.3.3: complete new subclause on residual life; Tables 29 to 32 moved to Annex C; New Annex B with assessment examples. Key words: Turbines, Storage pump, Pump turbines, Rehabilitation, Performance.
Loading
Cookies Cookies

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů.