IEEE 2800.2-2026 img
Active standard | Published: 30/06/2026

IEEE 2800.2-2026

IEEE Recommended Practice for Test and Verification Procedures for Inverter-Based Resources Interconnecting with Bulk Power Systems

Available languages: English

Available design: electronic (protected pdf) - Immediate download, Print design

from 195.00 USD show on eshop

Detail information

Designation: IEEE 2800.2-2026

Publication date: 30/06/2026

Pages: 263

Country: International technical standard

Where to buy?

You can buy at www.mystandards.biz

Anotation

New IEEE Standard - Active.
This document defines recommended practices for conformity assessment procedures that should be used to verify plant-level conformity with IEEE Std 2800 for IBR plants interconnecting with a bulk power system. The document applies to IBRs in transmission and sub-transmission systems, as defined by the connecting utility. The document may also apply to isolated IBRs that are interconnected to an alternating current (AC) transmission system via dedicated voltage source converter high-voltage direct current (VSC-HVDC) transmission facilities, e.g., offshore wind farms. This recommended practice complements the IEEE 2800 test and verification framework with specifications for the equipment, conditions, tests, modeling methods, and other conformity assessment procedures that should be used to demonstrate conformance with IEEE 2800 technical minimum requirements for interconnection, capability, and performance of applicable IBRs.

ISBN: 979-8-8557-3343-3, 979-8-8557-3344-0
Number of Pages: 263
Product Code: STD28766, STDPD28766
Keywords: active power, battery energy storage system, capability, co-located resource, commissioning test, control, design evaluation, enter service, energy storage, evaluation, fast frequency response, frequency, frequency response, harmonic current, harmonic voltage, hybrid resource, IEEE Std 2800, integrity, interconnection, interoperability, inverter, inverter-based resource, isolation device, measurement accuracy, modeling, model validation, negative-sequence, performance, positive-sequence, power quality, primary frequency response, protection, reactive power, reference point of applicability, ride-through, solar photovoltaic power, standard, technical minimum, transient overvoltage, type test, unbalance, verification, voltage, weak grid, wind power
Category: Power Generation|Protective Relaying|Power Systems Communication|Power Transmission and Distribution|Electric Machinery
Loading
Cookies Cookies

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů.