IRS 60671-1ed. img
Active standard | Published: 01/02/2020

IRS 60671-1ed.

Implementation of a High-Speed Railway, emerging Phase

Available languages: English

Available design: electronic design (pdf)

from 1 058.90 USD show on eshop

Detail information

Designation: IRS 60671-1ed.

Publication date: 01/02/2020

Pages: 38

Country: International technical standard

Where to buy?

You can buy at www.mystandards.biz

Anotation


IRS 60671 is the second part of the Implementation of a High-Speed Railway series, specifying the main requirements of the emerging and pre-feasibility study stages. Information required by potential investors is gathered during the emerging stage. The pre-feasibility study builds on the emerging stage with regard to technical, social and economic aspects of the proposed HSR project, with the aim of gaining support for the viability of the project.
Loading
Cookies Cookies

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů.