Performance of buildings — Building enclosure thermal performance verification and commissioning — Part 1: General requirements
(Performance des bâtiments — Vérification de la performance thermique de l´enveloppe des bâtiments et mise en service — Partie 1: Exigences generales)

Available languages: English

Available design: electronic design (pdf), Print design

from 204.20 EUR show on eshop

Detail information

Designation: ISO 21105-1:2019

Publication date: 14/11/2019

Pages: 27

Country: International technical standard

Where to buy?

You can buy at www.mystandards.biz

Anotation

Description / Abstract: This document describes a building enclosure commissioning process to achieve a well performing, durable and maintainable building enclosure. This document includes procedures, methods and documentation requirements describing the application of the commissioning process to a building enclosure at each phase of a project. These project phases span from predesign through owner occupancy and operation. This process is referred to throughout this document as building enclosure commissioning (BECx). This document applies to new building construction and building re-commissioning. This document is for use by an owner, commissioning provider, building developer, owners representative, construction manager, architect, contractor, and/or consultant, etc. Its purpose is to determine and complete the required tasks and activities to deliver a building enclosure which meets the performance requirements of the owner. Requirements for the project are established by the owner and/or commissioning provider (CxP). This document identifies steps necessary to perform a building enclosure risk analysis. The analysis will result in tasks that define the level of BECx, commensurate with the owners tolerance for risk associated with building enclosure performance. The BECx process covered by this document is applicable to an individual assembly, a combination of assemblies or a whole enclosure assembly. For example, an individual assembly can be the fenestration, the air barrier or the thermal insulation. A combination of assemblies would include the fenestration, the air barrier and the complete heat transfer system, (e.g. both the insulation and roof assembly). A whole building enclosure assembly would include all heat, air and moisture control layers of the building enclosure, on all six sides of the building. This document describes requirements for any third-party consultants and/or building enclosure commissioning providers (BECxP) to document their technical qualifications, independence and knowledge of the BECx process, including their education, training, and experience.
Loading
Cookies Cookies

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů.