IWA 33-3:2021 img
Active standard | Published: 16/03/2021

IWA 33-3:2021

Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements
(Lignes directrices techniques pour le développement de la petite hydraulique — Partie 3: Titre manque)

Available languages: English

Available design: electronic design (pdf), Print design

from 261.50 EUR show on eshop

Detail information

Designation: IWA 33-3:2021

Publication date: 16/03/2021

Pages: 80

Country: International technical standard

Where to buy?

You can buy at www.mystandards.biz

Anotation

Description / Abstract: This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments. Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.
Loading
Cookies Cookies

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů.