ISO/IEC/IEEE 24748-4-ed.2.0 img
Aktivní norma | Vydána: 17.02.2026

ISO/IEC/IEEE 24748-4-ed.2.0

Systems and software engineering - Life cycle management - Part 4: Systems engineering management planning
(Ingenierie des systemes et du logiciel - Gestion du cycle de vie - Partie 4: Planification de la gestion de l´ingenierie des systemes)

Dostupné jazyky: Anglicky

Dostupné provedení: Elektronické PDF, Tištěné, CD-ROM

od 6 339.80 CZK zobrazit na eshopu

Podrobné informace

Označení: ISO/IEC/IEEE 24748-4-ed.2.0

Datum vydání: 17.02.2026

Stran: 51

Země: Mezinárodní technická norma

Kde koupit?

Můžete zakoupit na eshop.normservis.cz

Anotace

This document:
  • provides an expanded view of the processes from ISO/IEC/IEEE 15288 that implement systems engineering (SE) management for the life cycles of technical solutions;
  • describes a required information item, termed the systems engineering management plan (SEMP) for the technical management and execution of the SE of technical solutions,
  • provides requirements and guidance for the content of the required information item.
This document is applicable to:
  • those who use or plan to use ISO/IEC/IEEE 15288 on projects dealing with human-made systems, products and services;
  • those who are responsible for the technical management of projects concerned with the engineering of systems;
  • those responsible for planning or executing ISO/IEC/IEEE 15288 system life cycle processes at a project level;
  • organizations and individuals involved with a technical project management effort;
  • anyone developing engineering management documentation to complete technical planning aspects of their project’s processes.
This document is intended to provide guidance for two-party situations and can be equally applied where the two parties are from the same organization. This document can also be used by a single party as self-imposed tasks. This document can also serve as guidance in multi-party situations, where high risks are inherent in the supply and integration of complex systems, and procurement can involve several suppliers, organizations or parties.
Loading
Cookies Cookies

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů. Souhlas udělíte kliknutím na tlačítko „OK“.

Souhlas můžete odmítnout zde.

Zde máte možnost přizpůsobit si nastavení souborů cookies v souladu s vlastními preferencemi.

Potřebujeme Váš souhlas k využití jednotlivých dat, aby se Vám mimo jiné mohli ukazovat informace týkající se Vašich zájmů.